Part No. & Revision No.: Customer Name: APQP Team:
PFD-TEX-XR33-6322380-AA XR33-6322380-AA Vestas Wind Systems A/S
Part Name: OME No.: Date:
-
Opn. No. 10. Operation Description Pierce nut material in & Inspection Pierce nut storage Flowchart Symbol Characteristics Nut size, M6 thread 11. Preservation from Rust 12. Pierce nut move to Opn no :80 Urethane foam material in & Inspection Urethane foam Storage Urethane foam move to Opn.110 Felt – 20mm Material in & Inspection Felt – 20mm Storage Felt – 20mm Move to Opn no : 120 Felt – 25mm Material in & Inspection Felt – 25mm Storage Felt – 25mm Move to Opn no : 130 20. 21. 22. 30. 31. 32. 40. 41. 42. LEGEND OPERATION: OPERATION WITH SIMULTANEOUS INSPECTION: STORAGE: Page 1 of 3
TRANSPORTATION: INSPECTION: SUPPLIER NAME Process Flow Diagram Reference No.:
Part No. & Revision No.: Customer Name: APQP Team:
PFD-TEX-XR33-6322380-AA XR33-6322380-AA Vestas Wind Systems A/S
Part Name: OME No.: Date:
-
Opn. No. 50. Operation Description Adhesive Material in & Inspection Adhesive storage Adhesive Move to opn. No ; 120 & 130 RM receiving for Bracket & Inspection Rm Storage Flowchart Symbol Characteristics 51. 52. 60. Thickness , Width of the coil 61. Prevention from Rust 62. Rm move to Opn. No : 70 Progressive notch, Pierce & part off Movement 70 Blank Length 71. Pull Load Strength , Tab angle, Tab bend height & pitch 80. Nut Clinching &Tab bending 81. Movement 90 Bending Bend height , Bending Position 91. Movement LEGEND OPERATION: OPERATION WITH SIMULTANEOUS INSPECTION: STORAGE: Page 2 of 3
TRANSPORTATION: INSPECTION: SUPPLIER NAME Process Flow Diagram Reference No.:
Part No. & Revision No.: Customer Name: APQP Team:
PFD-TEX-XR33-6322380-AA XR33-6322380-AA Vestas Wind Systems A/S
Part Name: OME No.: Date:
-
Opn. No. 100 Operation Description Flowchart Symbol Characteristics Plating Plating Thickness , Salt spray test Passivation color, Water mark & white patches Position of the foam Position of the felt / Excessive or inadequate gluing Position of the felt / Excessive or inadequate gluing 101 101 110 Visual Inspection Movement to assy. Foam Pad Fixing 120 20mm felt fixing 130 25mm felt fixing 140 Final inspection Packing in small carton box Move to stores for storage Informing Customs authority for inspection Customs approval & Final packing Dispatch Absence of M6 thread, Felt Position, Plating appearance 150 155 160 165 170 LEGEND OPERATION: OPERATION WITH SIMULTANEOUS INSPECTION: STORAGE: Page 3 of 3
TRANSPORTATION: INSPECTION: SUPPLIER NAME Process Flow Diagram