Intec Manufacturing (Asia) Pte Ltd

COVER PAGE

Procedure Title :

Tooling Management (New / Transfer)

PM / PR / 002 03

Ma Shiu Cheung Process Engineer

Document No. : Revision Prepared By Signature

: : :

Approved By : Signature

:

Eddie Sim

General Manager

Effective Date :

1 August 2003

Private & Confidential

Intec Manufacturing (Asia) Pte Ltd

Document Number PM / PR / 002

Revision 03 Effective Date 1 August 2003 Page 2 of 4 Copy Number Tooling Management (New / Transfer)

1. Objective

To establish a procedure whereby all new / transferred tooling are received and maintained. 2. Scope

Applies to all new production tooling or transferred tooling from customers and associates. 3. Procedure Flow

Responsibilities

3.1 Production

Engineering

Procedure Outline

 Receive new tooling  Inform Project Engineering of

any non-conformance  Raise Work Order to vendor’s

Tool-Room  Transport tooling to vendor’s

Tool-Room  Review Tooling checklist

Interfaces

 Delivery Order  Project Engineering  Tooling Work Order

(Form/C/TL/008)  Tooling Checklist

3.2 Production

 Perform Mold testing

 Mold Testing Request

(Form/I/EN/016)  Molding Process Determination

Form (Form/I/PD/039)

 Tooling Checklist  Molding Data Sheet

(Form/I/PD/008)

 Tooling Mold Life Records

3.3 Production

Engineering

 Update records

Private & Confidential

Intec Manufacturing (Asia) Pte Ltd

Document Number PM / PR / 002

Revision 03 Effective Date 1 August 2003 Page 3 of 4 Copy Number Tooling Management (New / Transfer)

4. Procedure Details

4.1 Production Engineering

4.1.1. Receive and check new / transferred tooling for any visual damage. Acknowledge the

Delivery Order if tooling is in good condition. In the event when any non-conformance is discovered, inform Project Engineering. Project Engineering is to follow up with supplier / customer.

4.1.2. For transferred tooling, raise work order and route the tooling to vendor’s Tool-Room for

inspection and marking / numbering.

4.1.3. Upon receiving the tooling from vendor’s Tool-Room, review the Tooling checklist and if it

is a new tooling, review tooling report together with Project Engineering & Production. Liaise with Project Engineering and Production Control for mold testing.

4.2 Production

4.2.1. Perform mold testing and record the data in the Molding Process Determination Form. 4.3 Production Engineering

4.3.1. Update Molding Data Sheet.

4.3.2. Update Tooling Mold Life Records. 4.3.3. Update Tooling Checklist.

Private & Confidential

Intec Manufacturing (Asia) Pte Ltd

Document Number PM / PR / 002

Revision 03 Effective Date 1 August 2003 Page 4 of 4 Copy Number Tooling Management (New / Transfer)

CHANGE RECORD

Description of Change

1. Re-write to reflect new practices and remove redundancies. Introduce new format.

1.1 This procedure was part of Tooling Management (Production), it has now been split into 2

separate procedures.

1.2 Change the title from “Tooling Maintenance (New / Transfer)” to “Tooling Management (New

/ Transfer)”.

2. 3.