时间123456789101112131挖土及垫层2钢筋3土方工程钢筋混凝土模板基础混凝土456砌砖基础基础及回填砌砖墙模板7砌筑工程现浇柱、梁钢筋、板、楼梯混凝土891011屋面防水12131415161718装饰工程1920212223门窗玻璃及油漆地面贴釉面砖楼梯地面外墙装饰台阶散水m2m21026m30.00351.8311341.35.2525.2013.4447.62112.04131.041512.00111111111631228332515814444446020202037.5tm2m34.889.60.1576.80.62115.593612600.970.141.2m3mm33tm2m3块m310480.294308.1119.28.66190.41.481080103.548350448342018900.121132.23166.27281.79安装楼板楼板灌缝屋面板上找平卷材防水砂浆保护层架空隔热板楼地面内墙及顶棚抹灰厨厕贴瓷砖安门窗扇内墙及顶棚刷涂料17200.0150.040.040.0519.3220.1624.151111111111111119202461252630911822421911152828242424242424242m2m2m3m2m2m2m2m2m20.731307.020.376710.647675.50.095729.1711408820.630.25718.20220.507675.50.034260.97142821002104725960.137195.640.25525.00m2m2m20.485101.850.110.18519.7517.2824竣工验收131313136699151512120工期176天,总施工人数7034人,峰值人数71人,平均每天施工人数40人,劳动力不均衡系数1.775<1.8.7060504030201003月14151617181920212223242526272829303112345678四月9101112131415161718192021222324250000282861614158253325404725404725404732404732404732404732404732404732404732404732施工进度横道图表
5月26272829301234567891011121314151617181920212223242526272829303112345674047324047324047324047324047324047324047324047324039715147007007192024616161616月89101112131415161718192021222324252627282930123456787月91011121314151617181920612525252525252551515151515151606060606060717171717171717168686868686868425050717171718月2122232425262728293031123456789101112131415161718192021222371716464646464646464636363636363636325252525252525252121212121213030